Image
Image
Image

Switchable Cementing Sleeve Unlimited Staged Fracturing Technology


Technical features

  • Cementing cement is used to realize fracturing interlayer isolation without additional perforation and open hole packer, which greatly reduces the construction cost and is safe and reliable;
  • Tools enter the well at one time to realize integration of well completion and modification.The construction process is simple and the operation efficiency is high;
  • The well completion fracturing pipe string has a simple structure. Fracturing stages are not limited;
  • After fracturing operation, there is full drift diameter in the wellbore, which is favorable for later liquid flowback and subsequent tool running;
  • It is beneficial to the later transformation and maintenance of the well. In case of water production in the production layer, the sliding sleeve can be closed by lowering the cementing sliding sleeve switch tool to achieve the purpose of plugging the bottom water.。

Technical principles

A sliding sleeve and a casing pipe column are run into a well in series, and after conventional well cementation is carried out, the cement used in the cementing process is relied upon to achieve the isolation between the fracturing layers. The switch tool is run in through the tubing or coiled tubing. The protruding lock block on the switch tool cooperates with the shoulder of the sliding sleeve. By pulling up the tubing string, the flow hole of the sliding sleeve is opened for the fracturing operation. After the first stage of fracturing is completed, the sliding sleeve is closed with the switch tool and the next stage sliding sleeve is opened until the operation is finished. The sliding sleeve is opened for production.

Infinite staged fracturing technology with switchable cementing sliding sleeve Tubular string

212793

 


 

A core component of that pipe column string is as follows:Cementing sliding sleeve capable of being opened and closed, sliding sleeve opening and closing tool, float collar and guide shoe. And the match tool has stable performance and simple operation.

Cementing sliding sleeve capable of opening and closing

Product features

  • Up-going opening mode is adopted to ensure that the sliding sleeve will not be opened in advance when the rubber plug goes down during cementing;
  • The number of fracturing stages is not limited, and there is no need for drilling operation because of the full drift diameter in the string.;
  • The inner surface of the sliding sleeve is coated with a special protective layer, so that the sliding sleeve is in quarantine with the cementing cement.;
  • The sliding sleeve is provided with a positioning mechanism, so that the switching tool can accurately position the sliding sleeve。
  • The sliding sleeve has a self-locking function in an opening or closing state, and the function is stable and reliable.。

Technical parameters

Model

Total length/mm

*Large outside diameter/mm

*Small diameter/mm

Operating temperature/

Operating differential pressure/MPa

On/off load

/kN

 

Both ends are connected with buckle type/in

4 ½″

900

φ151

φ101.6

150

70

40

4 ½ ″  LTC

5 ½″

970

φ171.5

φ124.3

150

70

40

5 ½ ″  LTC

Outline structure drawing

30974

Sliding sleeve switch tool

Product features

  • The sliding sleeve switch tool is in the normally open state, the pressure is withdrawn, and the sliding sleeve can be selectively opened and closed;
  • It has a special sand prevention function to prevent the possible sand jamming problems that may occur during operation.

Technical parameters

 

Model

Total length/mm

* Large outside diameter/mm

* Small diameter/mm

Operating temperature/

Withdraw pressure/MPa

Tensile load/kN

Suitable for sliding sleeve/in

Both ends are connected with buckle type/in

HTKG-60

530

φ60.3

φ20

150

4

>300

1/2 ″

3/8 ″

TBG

HTKG-90

780

φ90

φ30

150

5

>400

1/2 ″

7/8 ″

UP TBG

Outline structure drawing

32182

 

 

 

Beijing Zhongboda Petroleum Technology Co., Ltd.

Address of the unit: Building 12, No. 8, Heying Road, Nanshao Town, Changping District, Beijing

Tel: 010-64856065

Xi'an Branch

Unit address: 18th Floor, Tianxin Building, No. 27, Fengcheng 2nd Road, Weiyang District, Xi'an 

Tel: 029-86101780

Follow us
Image
Zhongboda WeChat official account

©2025  Polydoctor  Petroleum Technology Co., Ltd.,Beijing      Ministry of Public Security Registration Number:11011402012372        Ministry of Industry and Information Technology Registration Number:Beijing ICP No. 05044633-1