Image
Image
Image

Gas production (metering) skid at well site


 Product Introduction 

    The wellsite gas production (metering) skid is mainly installed at the wellhead of the gas well, which has the functions of pressure control and flow control, production regulation, emergency cutoff, continuous metering of single well, etc., applicable to the standardized construction of the wellsite. The product adopts highly integrated and functional modular design, which can effectively reduce the site construction cost, construction period and floor area, improve the quality of equipment design and production, and effectively realize the fine and standardized management of equipment.

   In order to meet the application and transportation requirements of single well and cluster well pad, the well pad gas production (metering) skid is mainly divided into 1 ~ 3 well pad gas production (metering) skids, and more than 3 well pad gas production (metering) skids combined.

   The equipment has significant advantages in installation, migration, floor space, function integration, safety performance, automation control, investment saving, environmental protection and energy saving, and is suitable for a variety of scenarios and industries.

 Product Introduction 

.  Integrated, modular design, compact structure, small footprint

.  Factory production, reduce construction cost and shorten construction period

.  Skid-mounted structure, easy to install and move

.  It has the functions of pressure control, flow control and production regulation

.  It has the functions of emergency cutoff and single well continuous metering.

.  Wellsite data acquisition, storage, analysis and other functions

.  Remote switch gas well and intermittent production function of gas well

.  Serialized and standardized skid-mounted equipment is applicable to various process requirements.

 

 Technical Parameters 

. Emergency cut-off valve and upstream design pressure: 42 MPa, 35 MPa, 25 MPa, 16 MPa

. Design pressure of process pipeline after emergency shut-off valve: 10 MPa, 6.3 MPa and 4.0 MPa

. Nominal diameter of main pipeline: DN100, DN65, DN50

. Nominal diameter of aggregate pipeline: DN250, DN200, DN150, DN100

. Design temperature: -20 ℃ ~ 80 ℃

. Material of pipeline in skid: Q345E, L245N, L245NS, L360N, L360NS, etc. 

. Valve material: A105, WCB, WCC, etc.

. Explosion-proof grade: ExdIIBT4

 

Core technologies and key components

 

The metering intelligent control valve, emergency shut-off valve and flowmeter in the gas production (metering) skid at the well site are all products independently designed and produced by our company, and relevant patents or software copyrights have been obtained.

 

 Execution Standards 

GB50349 Specifications for Gas Field Gathering and Transportation Design

GB50251 Specifications for Natural Gas Transmission Pipeline Engineering Design

GB50183 Fire Protection Design Specifications for Petroleum and Natural Gas Engineering

GB/T9711 Steel Pipes for Pipeline Transportation Systems in the Petroleum and Natural Gas Industry

GB/T 6479 Seamless Steel Pipes for High-Pressure Fertilizer Equipment

GB50058 Design Specifications for Electrical Installations in Explosive Atmospheres

HG/T20592~20635 Steel Pipe Flanges, Gaskets, Fasteners

GB50264 Specifications for Industrial Equipment and Pipeline Insulation Engineering Design

GB/T 13927 Pressure Testing of Industrial Valves

GB/T 13384 General Technical Conditions for Packaging of Mechanical and Electrical Products

GB50235 Specifications for Construction of Industrial Metal Piping Projects

GB 31032 Welding and Acceptance of Steel Pipelines

GB/T12224 General Requirements for Steel Valves

SY/T 7700 Instrument Control System Design Specifications for Oil and Gas Fields and Pipeline Engineering

GB50093 Construction and Quality Acceptance Specifications for Automation Instrumentation Engineering

 

 Application Cases 

The wellsite gas production (metering) skid has been promoted and applied in units such as China United Coalbed Methane, Yanchang Gas Field, and Changqing Oilfield. Through field applications, the modular and integrated design has reduced the average engineering footprint by 30%. Assembly and debugging are carried out in the factory, and on-site work only requires connecting pipeline interfaces and external electrical connections, which can shorten the construction period by 50%. Additionally, the skid structure facilitates overall relocation, enhancing equipment utilization and rapid deployment capabilities.

CNOOC China United Coalbed Methane Well Site

 

CNOOC China United Coalbed Methane Well Site

 

Yanchang Gas Field Well Site

 

Beijing Zhongboda Petroleum Technology Co., Ltd.

Address of the unit: Building 12, No. 8, Heying Road, Nanshao Town, Changping District, Beijing

Tel: 010-64856065

Xi'an Branch

Unit address: 18th Floor, Tianxin Building, No. 27, Fengcheng 2nd Road, Weiyang District, Xi'an 

Tel: 029-86101780

Follow us
Image
Zhongboda WeChat official account

©2025  Polydoctor  Petroleum Technology Co., Ltd.,Beijing      Ministry of Public Security Registration Number:11011402012372        Ministry of Industry and Information Technology Registration Number:Beijing ICP No. 05044633-1